In development
2026 Vagsland Ice Axe Hammer
Product details Handle Material Aluminum Alloy Standard Finish Anodized Axe Head Material Steel Axe Head Length 23cm Available Length 60, 65, 70, 75, 80 cm Available Color All color available Usage Ice mountain climbing Name Bending...
This product is still being evaluated. Join early access for verified details and launch updates.
Get product updatesOverview
Product details
| Handle Material | Aluminum Alloy |
| Standard Finish | Anodized |
| Axe Head Material | Steel |
| Axe Head Length | 23cm |
| Available Length | 60, 65, 70, 75, 80 cm Available |
| Color | All color available |
| Usage | Ice mountain climbing |
| Name | Bending Ice Hammer |
| Net weight in 65cm | 711g |
| Certificate | CE EN 13089+A1:2015 |
Built for precision in alpine conditions.
- Offered in a range of lengths, from compact to full-size technical options.
- Anti-slip rubber grip ensures secure handling in all conditions, with or without gloves.
- Curved shaft design provides added clearance for efficient movement and placement.
- Lightweight, high-grade anodized aluminum shaft delivers strength, corrosion resistance, and a clean, refined finish.
- High-strength steel head and hammer, finished in black, built for performance on hard snow and technical terrain.
- Integrated attachment points in the head and spike for anchoring and connection systems.
- Toothed pick and functional adze allow for secure placements and efficient step cutting.
- Balanced construction ensures controlled swings and stable performance across ice, alpine routes, and big wall environments.
- Engineered to meet PPE standards under Regulation (EU) 2016/425 and EN 13089+A1:2015.





Intended use
Details are being verified before publication.
Limitations
Details are being verified before publication.
Verified specifications
Details are being verified before publication.
Care
Details are being verified before publication.
Shipping and returns
Shipping details will be published before this product is available.
Warranty
Warranty terms are being established and will be published before launch.